PATHE MOTORWAY, KAPANDRITI – INOFITA SECTION
Completion Year:
2010 A section of 10km of PATHE Motorway was laid with micorsurfacing (0-10mm), on a total surface of 290.000 square metres. The project works took place between 2/8/2010 and 23/9/2010. After the application, the antiskid factors measured with British Pendulum were exceptional high, having a mean value of 73.